StepTodayImprovement
01
Requirement
The release date is fixed, the scope grows, and plan exchange changes and defects wait for the same engineers.
→ImprovementOur engineers join where the bottleneck is, in development, verification or documentation, and work to your release plan.
02
Design
The import and export of RT objects are designed after the module, and the next system reads them differently.
→ImprovementThe import and export of each RT Structure Set, RT Plan and RT Dose object is designed together with the module that writes it.
03
Implementation
New engineers need months before they can change planning code safely.
→ImprovementOur engineers start with a small work package under your review, so you judge their code before the team grows.
04
Verification
Regression and interface tests run late, so verification is behind development before every audit.
→ImprovementRegression and interface tests run in the pipeline on every change, so the records exist when the work is done.
05
Release
A change without its risk assessment stops the release at the gate.
→ImprovementEvery change carries its safety impact analysis, as IEC 62304 asks, so the release record is complete at the gate.
06
Field support
A plan exported from your system fails at a clinic's oncology information system, and the failure is hard to reproduce.
→ImprovementWe reproduce the failure from the site's export and add the case to the interface tests.
07
Change
A new DICOM RT version or OIS interface leaves the conformance statement and the tests out of date.
→ImprovementThe conformance statement and the interface tests are updated in the same change.