StepTodayImprovement
01
Requirement
The release date is fixed, the scope grows, and DICOM (the standard for medical images and their exchange) updates and field defects wait for the same engineers.
→ImprovementOur engineers join where the bottleneck is, in development, verification or documentation, and work to your release plan.
02
Design
Design decisions in a large platform are written down after the code, and the link to the requirement is added shortly before the audit.
→ImprovementThe design is written and linked to its requirement and risk assessment in your tools before the code.
03
Implementation
New engineers need months before they can change the platform safely.
→ImprovementOur engineers start with a small work package under your review, so you judge their code before the team grows.
04
Verification
Tests are written and run late, so verification is behind development before every audit.
→ImprovementAutomated regression runs with every change, so verification keeps pace with development.
05
Release
Manual build and test steps hold up each release.
→ImprovementAn automated build and test chain runs these steps for every release.
06
Field support
Root cause analysis of field defects takes engineers away from planned work.
→ImprovementOur engineers take over the root cause analysis, and each fix comes with a regression test.
07
Change
After a change, gaps in traceability turn into audit findings.
→ImprovementEach change gets a documented assessment of whether the notified body has to be told or a new FDA submission is needed, and traceability from requirement to release is updated with it, so the file is complete before the audit.